During the summer, as the upper part of the scaffolding began to be removed, the ironworkers, carpenters and tinsmiths were hard at work on the heights that were still accessible;
The ironworkers re-installed the 40 metres of railings on the courtyard, which had previously been restored in the workshop; They were sealed into the depth of the stone to ensure the safety of this 25m-high passageway; The workmen also grilled all the openings, bays, vents, etc. to prevent pigeons and other vermin from entering;
The tinsmiths continued their work by coating the entire courtyard with tinned copper to complete the rainwater routing;
The bell tower regains its youthful appearance, lost 5 centuries ago; At least on the outside, as work now continues on the inside;